A 10 years old CW multistage system (5 stages: Imhoff+HF+VF+HF+FWS) treating the municipal wastewater for a town of 3500 inhabitants.
Saint Sulpice la Foret : a 1000 PE waste stabilization pond boosted to 1950 PE by addition of reed bed filters. A 2,400 m², vertical flow reed bed (French system), a 1,950 m² second stage vertical flow, unsaturated plus a 10,000 m² of willow plantation and a 5,000 m² pond treating 400 m3/d of domestic effluent.
Compact reed bed filter to treat raw unsettled domestic sewage (French system). Capacity : 315 people equivalent. Design and build : Epur Nature -2014.
Bezannes : a 8000 m² artificial pond plus 3500 m² of reed bed filters and 1600 m² of wetlands were created to treat stormwater runoff from a large non-residential area.
A vertical flow reed bed (French system) and a vegetated polishing zone (surface flow wetland) treating 117m3/d of domestic effluent from a village with variable population
Seefood processing plant where the wastewater from cleaning fish and shellfish is treated in a VF wetland planted with papyrus.
The effluent is reused after ozonisation in the plant.
Sludge type: Active
Sludge volume per year: 500 tonnes DS/year
PE, amount: 8,000
Vertical flow constructed wetland, treating domestic wastewater from 2 streets in the rural area around Aalter, Belgium