Location: Nordborg, Denmark
Established: 2003
Number of basins: 10
Sludge type: Activated sludge and digested sludge
Sludge volume: 350 tonnes DS/year
PE, amount: 15000
Two vertical flow wetlands. One is a circulation system treating the pond water. The other treats the wastewater from the outside toilets
One stage of reed beds fed with raw sewage assures primary and secondary treatment for 1200 People Equivalent, followed by a trickling filter for polishing and nitrification. A tertiary UV treatment enables a pathogens removal by 4 U log.
Yaxley: A three stage system comprising lagoon with floating reed beds, surface flow horizontal and sub surface flow horizontal to treat 170 m3/d of vegetable wash water.
Two constructed wetlands at Warsco Genk treat the run-off from 1 ha pavement and the cleaning water from a washing street for temporary units.
Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.
Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.
Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.
Llanfair PG: A 440 m2, vertical flow reed bed treating 55m3/d of domestic effluent from a residential education centre.
A horizontal subsurface flow constructed wetland treating the wastewater from a housing scheme in the tropical island of Mayotte
Segonzac wastewater treatment plant for domestic sewage - Capacity 1600 people equivalent. In the shape of snail, emblem of the village. Design : Epur Nature. 2014