Earls Colne: Two 800m2 vertical flow reed beds operated alternately to treat 1,168m3/d of tertiary sewage waste water.

Vertical flow reed bed filter (French system) followed by a trickling filter and a treatment with apatite treat the pollution of raw domestic sewage. Capacity : 1500 p.e. Vegetated effluent discharge area before final reject into the small river "Merderic".

At Escurolles, in central France (Allier), a reed bed fed with raw sewage assures primary and secondary treatment for 705 PE , followed by a tricking filter for polishing and nitrification 

Two stage vertical flow wetland with recirculation. The system treats the wastewater from the ecological office building. The treated wastewater is reused for toilet flushing.

Saint Sulpice la Foret : a 1000 PE waste stabilization pond boosted to 1950 PE by addition of reed bed filters. A 2,400 m², vertical flow reed bed (French system), a 1,950 m² second stage vertical flow, unsaturated plus a 10,000 m² of willow plantation and a 5,000 m² pond treating 400 m3/d of domestic effluent.

A horizontal subsurface flow constructed wetland treating the wastewater from a housing scheme in the tropical island of Mayotte 

Two constructed wetlands at Warsco Genk treat the run-off from 1 ha pavement and the cleaning water from a washing street for temporary units.

 

Wastewater treatment plant for 1200 p.e. at St-Affrique-les-Montagne, south west of France (Tarn), with 1 vertical flow reed bed combined with a surface flow polishing treatment

Mayfield: A 2.1 hectare, 12  bed aerated horizontal system treating airport run off contaminated with glycol based antifreeze.

Treatment of aerobically stabilized sewage sludge from an activated sludge plant (“extended aeration”) – 13 000 p.e.