"Zero Emission" would be the general goal for sustainability. Especially for industrial production. Tertiary treatment with constructed wetlands may be a proper solution for closing the loop. The new treatment wetland at Changshu Advanced Materials Industrial Park, Haiyu Town, Jiangsu Province, China, is not only reclaiming water. It is a stepping stone for humans searching nature and for endangered species within a widely industrialized zone. Designed as a beautiful park it provides recreational functions and serves as buffer stripe between chemical industries and urban areas.

The wetland visitor center with its terraces on the roof and near the water level reveals a stunning new perspective. Intersted visitors will be given looks inside of the wetland when entering the exhibition on the first floor. Accomplished with a water laboratory and wetland control room the Changshu AMIP wetland center is a perfect place for training and dissemination of environmental solutions.

 

Client: Skive Municipality

Location: Skive, Denmark

Established: 1998 

Number of basins: 18

Sludge type: Activated sludge

Sludge volume: 1,375 tonnes DS/year

PE, amount: 123,000

 

Peterborough: A 2,570m2 Horizontal sub-surface flow reed bed treating hydrocarbon loaded run-ff with peak flows of 1,420 m3/day.

Bobbingworth: A 560m2, surface flow reed bed treating 30m3/d of iron loaded landfill leachate 

Treatment of aerobically stabilized sewage sludge from an activated sludge plant (“extended aeration”) – 13 000 p.e.

A horizontal subsurface flow constructed wetland treating the wastewater from a housing scheme in the tropical island of Mayotte 

Client: Nakskov Municipality

Location: Nakskov, Denmark

Established: 1990

Number of basins: 10

Sludge type:Activated sludge

Sludge volume: 870 DS/year

PE, amount: 33,000

Grenoble – urban park Ouagadougou: a 1 ha urban park with reed bed filters and surface flow wetlands collecting and treating stormwater runoff from the roofs of buildings and from adjacent roads in order to meet irrigation needs of the park and to reduce discharge of stormwater into the municipal sewer system. This project was the laureate of the NOVATECH 2013 international conference of sustainable urban drainage award http://novatech.graie.org/a_present_laureats.php

 

 

Client: Høje-Taastrup Municipality

Location:Kallerup, Denmark

Established: 1996

Number of basins: 2

Sludge type: Activated sludge

Sludge volume: 240 tonnes DS/year

PE, amount: 9,000

 

Client: Helsinge Municipality

Location:Helsinge, Denmark

Established: 1996

Number of basins: 10

Sludge type: Activated sludge

Sludge volume: 630 tonnes DS/year

PE, amount: 40,000