GWT Gold Sponsor at the ICWS2022

 

https://www.icws2022.insight-outside.fr/en/welcome/0

 

icws22 lyon

 

 

 


 

Client: Nordborg Municipality
Location: Nordborg, Denmark
Established: 2003
Number of basins: 10
Sludge type: Activated sludge and digested sludge
Sludge volume: 350 tonnes DS/year
PE, amount: 15000
Client: Skövde Municipality
Location: Skövde, Sweden
Established: 2003
Number of basins: 10
Sludge type: Activated sludge and digested sludge
Sludge volume: 1,200 Tonnes DS/year
PE, amount: 50,000
Client: Haslev Municipality
Location: Haslev, Denmark
Number of basins: 8
Sludge type: Active
Sludge volume per year: 500 tonnes DS/year
PE, amount: 8,000

Client: Sorø Municipality

Location: Tuelsø, Denmark

Established: 2003

Number of basins: 10

Sludge type: Activated sludge

Sludge volume: 550 tonnes DS/year

PE, amount: 22,000

Client: Nakskov Municipality

Location: Nakskov, Denmark

Established: 1990

Number of basins: 10

Sludge type:Activated sludge

Sludge volume: 870 DS/year

PE, amount: 33,000

Client: Northumbrian Water
Location: Hanningfield, UK
Established: 2012
Project period: 2010-2012
Number of basins: 16
Sludge type: Water works sludge
Sludge production: 1,275 tonnes DS/year
PE, amount: 1.5 - 2.0 million
Construction costs: approxiamtely 6 million £

Client: Høje-Taastrup Municipality

Location:Kallerup, Denmark

Established: 1996

Number of basins: 2

Sludge type: Activated sludge

Sludge volume: 240 tonnes DS/year

PE, amount: 9,000

 

Client: Greve Municipality

Location: Mosede, Denmark

Established: 1999

Number of basins: 10

Sludge type: Activated sludge

Sludge volume: 1,000 tonnes DS/year

PE, amount: 60,000

 

Client: Rudkøbing Municipality

Location: Rudkøbing, Denmark

Established: 1992

Number of basins: 8

Sludge type:Activated sludge

Sludge volume: 232 tonnes DS/year

PE, amount: 13,000

Septage treatment plant of Nègrepelisse with reed bed filters and reuse of the treated leachates to irrigate a Short Rotation Coppice. Capacity : 3500 septic tanks or 11000 m3/year equivalent to 131 T of SS/year. Designed and built by Epur Natur.

Page 1 of 2

 

 

 

 

 

GWT events @ ICWS2022

 


 ORAL PRESENTATIONS

 

7/11  9am  Anacleto Rizzo   (Keynote)

Wetland community expertise in the new Nature-Based Solution and Circular Economy vision: links and new research and design trends

 


7/11  10.40am  Dion van Oirschot

MULTISOURCE: Aerated wetland treating black and grey water for reuse at campsite Belgium

 


07/11   11:40am  Heike Hoffman

The potential of the French Wetland System for reuse - Results of a long-term project in the Peruvian arid coast area

 


7/11  4pm Heike Hoffman

Operational experiences with a sludge treatment wetland as part of a municipal WWTP in Brazil

 


7/11  4.30pm Fabio Masi

Water Projects Europe: NICE / MULTISOURCE

 


9/11  2pm Steen Nielsen

Treatment of industrial sludge in a pilot Sludge Treatment Wetland planted with Phragmites australis and Schenoplectus californicus

 


9/11  2pm Riccardo Bresciani

Reed beds for drying sludge from a winery wastewater treatment plant in Spain: the WETWINE project

 


9/11   4.40pm  Taxiarchis Seintos

Application of a full-scale UASB and two-stage constructed wetland system for water reclamation and nutrient recycling of domestic wastewater in arid areas

 


9/11  5pm Simos Malamis

Investigation of the use of different filling materials in unsaturated vertical flow constructed wetlands for the treatment of UASB effluent from domestic wastewater

T. Seintos, E. Statiris, F. Masi, C. Noutsopoulos, S. Malamis

 


9/11 5pm Scott Wallace

Practical aspects in the determination of first-order removal rate coefficients (k) for horizontal flow treatment wetlands

 


10/11 11.20am Fabio Masi

Electroactive and intensified pilot-scale constructed wetlands for the treatment of high loads of septic tank effluent

 


10/11 2.20pm Alain Petitjean

Intensified French Treatment Wetlands - Influence of operating parameters on nitrogen removal

 


10/11 4pm  Andy Freeman

Treatment of de-icer contaminated runoff at a UK airport using intensified Nature Based Solutions - A 10-year operational performance review

 


POSTERS

P4: Coupling French Reed Bed and Short Rotation Plantation for developing circular economy of wastewater in India: A case of PAVITR prototype / Anacleto Rizzo

P39: Constructed wetlands for the treatment of combined sewer overflow upstream of centralised wastewater treatment plants / Chiara Sarti