A ten years old system treating the wastewater produced by a winery in Central Italy. Cecchi is a famous wine producer in Italy and the production is certified ISO14001; all the wastewater produced by the "bottling department", located in Castellina in Chianti, Province of Siena, is appropriately treated before to be discharged in a nearby stream by a multistage constructed wetland.

Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).

Client: Skive Municipality

Location: Skive, Denmark

Established: 1998 

Number of basins: 18

Sludge type: Activated sludge

Sludge volume: 1,375 tonnes DS/year

PE, amount: 123,000

 

The two stage reed bed system at Aumont (500 PE), in the French Jura mountains meets stringent discharge standards in phosphorous removal through a third stage filtration with reactive media

Client: Vallø  Municipality

Location:Strøby Ladeplads, Denmark

 

Established: 1998

Number of basins: 8

Sludge type: Activated sludge

Sludge volume per year: 300

PE, amount: 9000

 

Hollange : a 432 m², vertical flow reed bed (French system) plus a 288 m² second stage unsaturated vertical flow filter, and a 1200 m² vegetated polishing zone treating 102 m3/d of domestic effluent.

Aerated wetland of 360 m², treating the sanitary waste water from an elementary school.

Vertical flow wetland, 75 PE for an ecological housing project in Arnhem, the Netherlands.

Pouembout : a 250 p.e. reed bed filter was created to replace a deficient waste stabilization pond.

One of the largest and most efficient wastewater treatment plant with french system reed bed filter in France.

Nominal capacity : 4000 p.e. with an extension to 6000 p.e.