GWT Gold Sponsor at the ICWS2022

 

https://www.icws2022.insight-outside.fr/en/welcome/0

 

icws22 lyon

 

 

 


 

One stage of reed beds fed with raw sewage assures primary and secondary treatment for 1200 People Equivalent, followed by a trickling filter for polishing and nitrification. A tertiary UV treatment enables a pathogens removal by 4 U log.

The Orhei Constructed Wetland treatment plant, the biggest secondary treatment entirely based on CWs in the world

 

Wastewater treatment plant for 1250 p.e., in a very touristic site in the south of France, separative sewerage system, constructed in 1998.

“French sytem” treating raw unsettled sewage in a 2 stage vertical flow reed bed filter without electricity

Albondon (600 PE) : the first "French system" in Spain, designed and build in 2005 by AKUT and SINT treats the waste water of a town in the foothills of the Sierra Nevada

One of the largest and most efficient wastewater treatment plant with french system reed bed filter in France.

Nominal capacity : 4000 p.e. with an extension to 6000 p.e. 

The municipal centralised treatment plant (a classic activated sludge technology) for the wastewater produced by the municipality of Jesi (Ancona province – central Italy) has been upgraded in the year 2002, with the realisation of a new “nitrification-denitrification” compartment and a hybrid Constructed Wetland as polishing stage. 

Vertical flow constructed wetland treating the sanitary wastewater from the border control office at Kallo (Antwerp, Belgium)

2-stage vertical flow reed bed filter for the treatment of raw unsettled domestic sewage (French system). Capacity : 1200 People Equivalent. 

Earls Colne: Two 800m2 vertical flow reed beds operated alternately to treat 1,168m3/d of tertiary sewage waste water.

An educational wetland of 30 PE treating the sanitary wastewater of a toilet building.

Page 1 of 4

 

 

 

 

 

GWT events @ ICWS2022

 


 ORAL PRESENTATIONS

 

7/11  9am  Anacleto Rizzo   (Keynote)

Wetland community expertise in the new Nature-Based Solution and Circular Economy vision: links and new research and design trends

 


7/11  10.40am  Dion van Oirschot

MULTISOURCE: Aerated wetland treating black and grey water for reuse at campsite Belgium

 


07/11   11:40am  Heike Hoffman

The potential of the French Wetland System for reuse - Results of a long-term project in the Peruvian arid coast area

 


7/11  4pm Heike Hoffman

Operational experiences with a sludge treatment wetland as part of a municipal WWTP in Brazil

 


7/11  4.30pm Fabio Masi

Water Projects Europe: NICE / MULTISOURCE

 


9/11  2pm Steen Nielsen

Treatment of industrial sludge in a pilot Sludge Treatment Wetland planted with Phragmites australis and Schenoplectus californicus

 


9/11  2pm Riccardo Bresciani

Reed beds for drying sludge from a winery wastewater treatment plant in Spain: the WETWINE project

 


9/11   4.40pm  Taxiarchis Seintos

Application of a full-scale UASB and two-stage constructed wetland system for water reclamation and nutrient recycling of domestic wastewater in arid areas

 


9/11  5pm Simos Malamis

Investigation of the use of different filling materials in unsaturated vertical flow constructed wetlands for the treatment of UASB effluent from domestic wastewater

T. Seintos, E. Statiris, F. Masi, C. Noutsopoulos, S. Malamis

 


9/11 5pm Scott Wallace

Practical aspects in the determination of first-order removal rate coefficients (k) for horizontal flow treatment wetlands

 


10/11 11.20am Fabio Masi

Electroactive and intensified pilot-scale constructed wetlands for the treatment of high loads of septic tank effluent

 


10/11 2.20pm Alain Petitjean

Intensified French Treatment Wetlands - Influence of operating parameters on nitrogen removal

 


10/11 4pm  Andy Freeman

Treatment of de-icer contaminated runoff at a UK airport using intensified Nature Based Solutions - A 10-year operational performance review

 


POSTERS

P4: Coupling French Reed Bed and Short Rotation Plantation for developing circular economy of wastewater in India: A case of PAVITR prototype / Anacleto Rizzo

P39: Constructed wetlands for the treatment of combined sewer overflow upstream of centralised wastewater treatment plants / Chiara Sarti