Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.

Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.  

Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.

 

Vertical flow constructed wetland treating the sanitary wastewater from the border control office at Kallo (Antwerp, Belgium)

Saint Bonnet le Froid : a 900 m², vertical flow reed bed (French system) plus a 600 m² second stage unsaturated vertical flow red bed for the treatment of  domestic effluent from a village with variable population.

 

Wastewater treatment plant for 1250 p.e., in a very touristic site in the south of France, separative sewerage system, constructed in 1998.

“French sytem” treating raw unsettled sewage in a 2 stage vertical flow reed bed filter without electricity

 

Beautiful two stage French system treating the wastewater of a hamlet in the outskirts of Paris

Aerated wetland at nursery home in Belgium

Resolis: Two 200m2 horizontal subsurface flow wetlands operated in paralell treating 10m3/d of secondary sewage.

Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).

Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.


Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.  

Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.

 