CSO-CW - Capiago Intimiano (CO)

First flush volume treated: max 130 mc per CSO event Scheme: VF + FWS Characteristics Multiobjective wetland for the exploitation of different ecosystem services: water quality, flood mitigation, increase of biodiversity and recreational activities IRIDRA has done the design and the work supervision.

Additional Info

  • Hydraulic load: m³/day
  • Organic load (PE): PE
Read 4901 times