Additional Info
In operation since: 2011
Type of wastewater treated: Stormwater (runoff)
Max. Hydraulic load: 15 000 m3
Watershed: 1 720 000 m²
Location : Bezannes, Champagne Ardennes TGV station, FRANCE
Client: REIMS METROPOLE
Stage 1 type: artificial pond
Stage 1 surface area (m²): 8000
Stage 2 type: reed bed filter
Stage 2 surface area (m²): 3500
Stage 3 type: surface flow wetland
Stage 3 surface area (m²): 1600
Cost: 4,800,000.00 €
Designed by SINBIO
Context
As part of the creation of the High Speed Train Station of Reims, Reims Métropole issued a call for a project to store and to treat the storm water of this non-residential area. The original project was a concrete tank buried under soil.
Targets
Sinbio’s target was to design an alternative project to minimize the use of concrete and give an added value for landscape, habitat and recreational uses. The proposal was to create three different areas: a pond, a reed bed filter, and a surface flow wetland. Construction began in 2009 with commissioning in 2011.