Municipality « LES BREVIAIRES » Hamlet « La Grange du Bois », Yvelines (78)
Wastewater treatment plant for 150 p.e., domestic sewage, separative sewerage system, constructed in 1994
Designed by SINT/SINBIO
“French sytem” treating raw unsettled sewage in a 2 stage vertical flow reed bed filter
1st stage 150 m² (3*50 m²), fed directly by pumping station after coarse, manual screening onlyn
2nd stage 225 m² (3 * 50 m²), fed by a siphon installed inside the drainage layer of stage 1.