The Badboot in Antwerp. Treatment of sanitary wastewater combined with wastewater from the swimming pool filters. FBA-type (aerated).
Balhall: A two stage, 185 m2,Aerated saturated vertical flow reed bed system treating 5 m3/d of settled, secondary sewage.
A 10 years old CW multistage system (5 stages: Imhoff+HF+VF+HF+FWS) treating the municipal wastewater for a town of 3500 inhabitants.
The municipal centralised treatment plant (a classic activated sludge technology) for the wastewater produced by the municipality of Jesi (Ancona province – central Italy) has been upgraded in the year 2002, with the realisation of a new “nitrification-denitrification” compartment and a hybrid Constructed Wetland as polishing stage.
The Orhei Constructed Wetland treatment plant, the biggest secondary treatment entirely based on CWs in the world
Llanfair PG: A 440 m2, vertical flow reed bed treating 55m3/d of domestic effluent from a residential education centre.
Crynant: Two 1,200m2 vertical flow reed beds operated alternately to treat 3,400 m3/d of tertiary municipal waste water.
More...
Earls Colne: Two 800m2 vertical flow reed beds operated alternately to treat 1,168m3/d of tertiary sewage waste water.
Resolis: Two 200m2 horizontal subsurface flow wetlands operated in paralell treating 10m3/d of secondary sewage.
Vertical flow constructed wetland treating the sanitary wastewater from the border control office at Kallo (Antwerp, Belgium)
Vertical flow constructed wetland, treating domestic wastewater from 2 streets in the rural area around Aalter, Belgium