Hanningfield Sludge Treatment Reed Bed System

Hanningfield STRB Photo: © Orbicon A/S
Client: Northumbrian Water
Location: Hanningfield, UK
Established: 2012
Project period: 2010-2012
Number of basins: 16
Sludge type: Water works sludge
Sludge production: 1,275 tonnes DS/year
PE, amount: 1.5 - 2.0 million
Construction costs: approxiamtely 6 million £
 

Additional Info

  • In operation since: 2012
  • Type of wastewater treated: Sludge: waste-water
  • Hydraulic load: m³/day
  • Organic load (PE): 1,5. - 2,0 mill PE
  • Location: Hanningfield, UK
  • Client: Northumbrian Water
Read 7046 times