A 10 years old CW multistage system (5 stages: Imhoff+HF+VF+HF+FWS) treating the municipal wastewater for a town of 3500 inhabitants.

Pouembout : a 250 p.e. reed bed filter was created to replace a deficient waste stabilization pond.

 

Beautiful two stage French system treating the wastewater of a hamlet in the outskirts of Paris

A horizontal subsurface flow constructed wetland treating the wastewater from a housing scheme in the tropical island of Mayotte 

Orelle (French Alps): a 1200 m², vertical flow reed bed (French system) plus a 800 m² second stage unsaturated vertical flow reed bed for domestic effluent under cold climate conditions.

 

Full scale pilot plant treating CSO overflow in the Greater Lyon area.

Saint Germain sur Ille : a 500 PE waste stabilization pond boosted to 900 PE by addition of reed bed filters with high standards for phosphorus and total nitrogen removal.

Aerated wetland for a hotel in Antwerp, Belgium

20 years old French system serving 200 p.e. in the Lyon area

Page 2 of 4