Saint Germain sur Ille : a 500 PE waste stabilization pond boosted to 900 PE by addition of reed bed filters with high standards for phosphorus and total nitrogen removal.

Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.


Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.  

Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.

 

Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.

Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.  

Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.

 

Aerated wetland at nursery home in Belgium

A vertical flow reed bed (French system) and a vegetated polishing zone (surface flow wetland)  treating 117m3/d of domestic effluent from a village with variable population

Albondon (600 PE) : the first "French system" in Spain, designed and build in 2005 by AKUT and SINT treats the waste water of a town in the foothills of the Sierra Nevada

Earls Colne: Two 800m2 vertical flow reed beds operated alternately to treat 1,168m3/d of tertiary sewage waste water.

Page 1 of 4