Balhall: A two stage, 185 m2,Aerated saturated vertical flow reed bed system treating 5 m3/d of settled, secondary sewage.
A horizontal subsurface flow constructed wetland treating the wastewater from a housing scheme in the tropical island of Mayotte
Seefood processing plant where the wastewater from cleaning fish and shellfish is treated in a VF wetland planted with papyrus.
The effluent is reused after ozonisation in the plant.
Saint Bonnet le Froid : a 900 m², vertical flow reed bed (French system) plus a 600 m² second stage unsaturated vertical flow red bed for the treatment of domestic effluent from a village with variable population.
In 2001, IRIDRA managed the design of a constructed wetlands system for the wine-producing firm “Tenuta dell’Ornellaia”, Leghorn, Italy. The system consists of vertical flow constructed wetlands (SFS-v) as a first stage followed by a second SFS-h stage with recirculation to the first stage and then by a single FWS. It treats wastewater from the firm, which allows water to be reused for irrigation
Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.
Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.
Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.
Two constructed wetlands at Warsco Genk treat the run-off from 1 ha pavement and the cleaning water from a washing street for temporary units.