Wastewater treatment plant for 1200 p.e. at St-Affrique-les-Montagne, south west of France (Tarn), with 1 vertical flow reed bed combined with a surface flow polishing treatment

Client: Kolding Municipality

Location:Kolding, Denmark

Established: 1998

Number of basins: 13

Sludge type:Activated sludge and digested sludge

Sludge volume: 2,000 tonnes DS/year

PE, amount: 125,000

 

Vertical flow FBA system treating deicing fluids of Buffalo airport, New York

Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).

Client: Galten Municipality

Location: Skovby, Denmark

Established: 1995

Number of basins: 8

Sludge type:Activated sludge

Sludge volume: 185 tonnes DS/year

PE, amount: 12,000

Client: Haslev Municipality
Location: Haslev, Denmark
Number of basins: 8
Sludge type: Active
Sludge volume per year: 500 tonnes DS/year
PE, amount: 8,000

The municipal centralised treatment plant (a classic activated sludge technology) for the wastewater produced by the municipality of Jesi (Ancona province – central Italy) has been upgraded in the year 2002, with the realisation of a new “nitrification-denitrification” compartment and a hybrid Constructed Wetland as polishing stage. 

Client: Høje-Taastrup Municipality

Location:Kallerup, Denmark

Established: 1996

Number of basins: 2

Sludge type: Activated sludge

Sludge volume: 240 tonnes DS/year

PE, amount: 9,000

 

Client: Skive Municipality

Location: Skive, Denmark

Established: 1998 

Number of basins: 18

Sludge type: Activated sludge

Sludge volume: 1,375 tonnes DS/year

PE, amount: 123,000