Full scale pilot plant treating CSO overflow in the Greater Lyon area.

2-stage vertical flow reed bed filter treating raw domestic sewage (French system) with a capacity of 650 P.E. Treated effluent goes through a filtering ditch and is rejected into the river Bourdic.

 

Wastewater treatment plant for 1200 p.e. at St-Affrique-les-Montagne, south west of France (Tarn), with 1 vertical flow reed bed combined with a surface flow polishing treatment

2-stage Vertical Flow Constructed Wetland for the treatment of raw domestic sewage (French system) for 1360 people-equivalent adapted to the local resources and climate with UV tertiary treatment.

Teeside: A 1000 m2, 3 stage passive vertical flow reed bed system, treating run off from an international airport fire fighting training facility.

 

Wastewater treatment plant for 1250 p.e., in a very touristic site in the south of France, separative sewerage system, constructed in 1998.

“French sytem” treating raw unsettled sewage in a 2 stage vertical flow reed bed filter without electricity

One stage of reed beds fed with raw sewage assures primary and secondary treatment for 1200 People Equivalent, followed by a trickling filter for polishing and nitrification. A tertiary UV treatment enables a pathogens removal by 4 U log.

Mayfield: A 2.1 hectare, 12  bed aerated horizontal system treating airport run off contaminated with glycol based antifreeze.

Vertical flow reed bed filter (French system) followed by a trickling filter and a treatment with apatite treat the pollution of raw domestic sewage. Capacity : 1500 p.e. Vegetated effluent discharge area before final reject into the small river "Merderic".

Metz –park of the Seille : collecting and treating stormwater from an adjacent new housing development area inside a 20 ha urban park  and renaturation of the river Seille, flowing along the park.

 

 

Page 1 of 10