The system consists of two parallel VF wetlands, each 45 m². A nature track is made surrounding the wetland with educational signs for children. The treated wastewater ends up in a basin with a RO-treatment unit where drinking water is produced out of the wastewater, feeding a small fountain. The rest goes into a little beak and then to a pond.