Wastewater treatment plant for 1250 p.e., in a very touristic site in the south of France, separative sewerage system, constructed in 1998.
“French sytem” treating raw unsettled sewage in a 2 stage vertical flow reed bed filter without electricity
Vertical flow reed bed filter (French system) followed by a trickling filter and a treatment with apatite treat the pollution of raw domestic sewage. Capacity : 1500 p.e. Vegetated effluent discharge area before final reject into the small river "Merderic".
Recirculated vertical flow French system for 800 p.e. with polishing in a "natural" horizontal flow wetland
The two stage reed bed system at Aumont (500 PE), in the French Jura mountains meets stringent discharge standards in phosphorous removal through a third stage filtration with reactive media
- Adapted „French system“ for a nursing home, Hogar de Ancianos Sta. Ana y San Joaquín y Asociación Ayuda Me Perú
- All treated wastewater is reused for irrigation of agricultural used area
- The 2 staged wetland system treats the domestic effluent of 55 residents and employees
- The pre-treatment is carried out on the surface of an planted, vertical flowed gravel bed wetland with 2 charging points, used alternately (2 and 2 days)
- The post-treatment is carried out in an planted vertical flowed sand bed wetland with 4 divisions to maintain always the biologically activity in all parts of the wetland
Design, Construction and Operation and mantainmance by Rotaria del Perú, online monitoring by SCADAweb
A 10 years old CW multistage system (5 stages: Imhoff+HF+VF+HF+FWS) treating the municipal wastewater for a town of 3500 inhabitants.
More...
A vertical flow reed bed (French system) and a vegetated polishing zone (surface flow wetland) treating 117m3/d of domestic effluent from a village with variable population
2-stage Vertical Flow Constructed Wetland for the treatment of raw domestic sewage (French system) for 1360 people-equivalent adapted to the local resources and climate with UV tertiary treatment.
Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.
Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.
Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.