Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.

Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.  

Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.

 

Segonzac wastewater treatment plant for domestic sewage - Capacity 1600 people equivalent. In the shape of snail, emblem of the village.  Design : Epur Nature. 2014

Earls Colne: Two 800m2 vertical flow reed beds operated alternately to treat 1,168m3/d of tertiary sewage waste water.

The municipal centralised treatment plant (a classic activated sludge technology) for the wastewater produced by the municipality of Jesi (Ancona province – central Italy) has been upgraded in the year 2002, with the realisation of a new “nitrification-denitrification” compartment and a hybrid Constructed Wetland as polishing stage. 

 

Beautiful two stage French system treating the wastewater of a hamlet in the outskirts of Paris

Orelle (French Alps): a 1200 m², vertical flow reed bed (French system) plus a 800 m² second stage unsaturated vertical flow reed bed for domestic effluent under cold climate conditions.

 

Crynant: Two 1,200m2 vertical flow reed beds operated alternately to treat 3,400 m3/d of tertiary municipal waste water.

Recirculated vertical flow French system for 800 p.e. with polishing in a "natural" horizontal flow wetland 

Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).