Bezannes : a 8000 m² artificial pond plus 3500 m² of reed bed filters and 1600 m² of wetlands were created to treat stormwater runoff from a large non-residential area.
The Badboot in Antwerp. Treatment of sanitary wastewater combined with wastewater from the swimming pool filters. FBA-type (aerated).
Tagged under
Tagged under
Client: Greve Municipality
Location: Mosede, Denmark
Established: 1999
Number of basins: 10
Sludge type: Activated sludge
Sludge volume: 1,000 tonnes DS/year
PE, amount: 60,000
One stage of reed beds fed with raw sewage assures primary and secondary treatment for 1200 People Equivalent, followed by a trickling filter for polishing and nitrification. A tertiary UV treatment enables a pathogens removal by 4 U log.
Client: Northumbrian Water
Location: Hanningfield, UK
Established: 2012
Project period: 2010-2012
Number of basins: 16
Sludge type: Water works sludge
Sludge production: 1,275 tonnes DS/year
PE, amount: 1.5 - 2.0 million
Construction costs: approxiamtely 6 million £
Location: Hanningfield, UK
Established: 2012
Project period: 2010-2012
Number of basins: 16
Sludge type: Water works sludge
Sludge production: 1,275 tonnes DS/year
PE, amount: 1.5 - 2.0 million
Construction costs: approxiamtely 6 million £
Client: Skövde Municipality
Location: Skövde, Sweden
Established: 2003
Number of basins: 10
Sludge type: Activated sludge and digested sludge
Sludge volume: 1,200 Tonnes DS/year
PE, amount: 50,000
Location: Skövde, Sweden
Established: 2003
Number of basins: 10
Sludge type: Activated sludge and digested sludge
Sludge volume: 1,200 Tonnes DS/year
PE, amount: 50,000
Tagged under