Client: Simrishamn Municipality

Location:Simrishamn, Sweden

Established: 1998

Number of basins: 8

Sludge type: Activated sludge

Sludge volume per year: 450

PE, amount: 25,000

At Escurolles, in central France (Allier), a reed bed fed with raw sewage assures primary and secondary treatment for 705 PE , followed by a tricking filter for polishing and nitrification 

Client: Skive Municipality

Location: Skive, Denmark

Established: 1998 

Number of basins: 18

Sludge type: Activated sludge

Sludge volume: 1,375 tonnes DS/year

PE, amount: 123,000

 

A 11000 m2 artificial pond and 2600 m2 reed bed filters were created for the storage and treatment of stormwater and runoff from Servier pharmaceutical Laboratories site in Gidy. Designed to be able to treat once-a-century rainfall. Capacity : 12000 m3. Design : Epur Nature. Established : 2014.

Pond treatment system to prevent algae growth at Bebat Tienen (Belgium)

An educational wetland of 30 PE treating the sanitary wastewater of a toilet building.

A 10 years old CW multistage system (5 stages: Imhoff+HF+VF+HF+FWS) treating the municipal wastewater for a town of 3500 inhabitants.

Client: Nakskov Municipality

Location: Nakskov, Denmark

Established: 1990

Number of basins: 10

Sludge type:Activated sludge

Sludge volume: 870 DS/year

PE, amount: 33,000